5 Challenges Architects Face During A Project

Architects face a unique set of management challenges. One of these is estimating billable hours. Architects cannot be expected to adhere to rigid estimates because quality is too important. However, teams are required to meet deadlines and ship deliverables on time. Other challenges include managing billable utilization. Since the time spent on creative activities is often not easily quantified, it can be challenging to know how much time will be required to complete a particular task. Visit this site to know about our architecture offices in Dubai.

Poor communication:

While architects have many opportunities to communicate with their clients, there is a real danger of miscommunication. This often occurs because architects make assumptions about the direction of the project and then expect their clients to understand the same. It is frustrating to work with a project team where the visions of multiple design principals are conflicting, and no one is sure how to proceed. Even if the communication is effective, it must be followed up by the entire project team.

Unrelated tasks:

Architects have many unrelated tasks that they perform throughout the project. These tasks include responding to usual situations within a set timeframe, issuing documentation and transmittals, and performing site inspections and testing. Architects’ relationships with clients are often strained when other parties assume responsibility for tasks that aren’t related to the architect’s role.

Unfamiliar technology:

There are numerous unfamiliar technology challenges architects face during a construction project. These include unforeseen design challenges, unfamiliar materials and technology, poor craftsmanship, inappropriate scheduling, and poor specification. In general, these challenges are experienced to some extent.

Poor decision-making:

There are a variety of challenges facing architects, but the most common is the lack of customer-centric listening. Architects are supposed to be leaders in their fields and should respond to customer needs. With the flattening of the industry, the need for local architects has diminished and the sameness and density of offerings among customers are increasing. This isn’t helping the traditional building process remain relevant. However, each individual can control the level of customer-centric listening.

Poor supervision:

The effectiveness of construction supervision is a critical component for the proper completion of any public building project. If construction supervision is ineffective, it becomes difficult for a project to be completed within the specified budget, time frame, and quality standards. This study aims to understand the impact of poor construction supervision on public building projects. To identify this problem, quantitative and qualitative research method was used. It involved questionnaires issued to 104 respondents.

By Deanna